How to Specify PU Cornice for a Hotel Fit-Out

Green Decoration390 words

Make the schedule traceable

A hotel project may repeat trim across many rooms, but the finish still depends on a precise product schedule. Give each profile a unique code and record dimensions, piece length, finish, room type and drawing reference. Use the same code in the quotation, sample label, purchase order and installation package.

List exceptions by room or zone. Guest rooms, corridors, restaurants and public areas may need different profiles or corner details. A generic line reading “PU cornice” is not enough to control a multi-room installation.

Approve a complete room mock-up

Review a physical sample and representative room or corridor mock-up before releasing the full production quantity. Check the profile against ceiling, lighting, curtain track, access panels and adjoining door trim. Inspect mitres and joints after the final paint system is applied.

Record the approved sample with photographs, product code, finish schedule and date. If the factory makes a revised sample, mark which version supersedes the previous approval. Keep the reference available to site and factory teams.

Plan replacement and delivery

Agree on room-by-room quantities, spare stock, carton labels, corner protection and delivery sequence. Confirm where cartons will be stored and whether the site has a dry, secure area. Ask the supplier to identify cartons by profile and room group.

If fire or other technical documents are required, list the exact document and applicable standard in the enquiry. The supplier can confirm what is available for the selected item. Before production, review product code, dimensions, finish, joint method and delivery details with procurement, design, site and installation teams.

For a hotel mock-up, agree acceptance points before the room is built: profile code and dimensions, corner alignment, joint visibility from normal viewing positions, coating colour and access around lights or curtains. Invite the installer and painter to review the same sample so responsibility for each finish step is clear. Once accepted, label the retained reference and include it in the room handover package. At delivery, match carton labels against the room schedule and set aside a small, documented reserve if the project plan calls for maintenance stock. Keep batch details with the retained sample. When the project team later requests replacement material, the supplier can compare the requested profile and finish against a concrete record rather than a vague description such as “the cornice used upstairs.”

Frequently Asked Questions

Q: What should a hotel cornice schedule include?

A: Include a unique profile code, dimensions, piece length, finish, room or zone, drawing reference, quantity and approved sample version.

Q: Should samples be approved before a hotel order?

A: Yes. Approve a representative finished sample or mock-up with the actual adjacent finishes and lighting before authorising repeat production.